Greenwich Peninsula M117
EWI System Application - Coverock R90 (120mm & 130mm & 160mm)
For Greenwich Peninsula M117, we supplied Coverock R90 for use on a residential project, supporting the build over a 4-month programme. With a total area of 3,900 m², the project required reliable material supply, technical support, and close coordination throughout the construction phase.
As with any residential scheme operating to a defined programme, maintaining product availability in line with site progress was essential to supporting efficient installation and overall project continuity. The insulation solution needed to align with both the performance requirements of the external wall build-up and the practical demands of the build.
Our involvement extended beyond product supply alone. In addition to delivering Coverock R90, we supported the project through specification assistance, site support, and ongoing cooperation with the site team to help manage logistics and respond to day-to-day site requirements as the works progressed.
Greenwich Peninsula M117 is a strong example of how the right insulation solution, combined with dependable service and effective site coordination, can support the successful delivery of a residential project. The case study highlights the value of integrating product supply with technical input and practical support throughout the programme.
Project in numbers
Duration
4 months
Application
EWI System Application
Overall quantity - m2
3 900

A1 Euroclass fire
Size: 1000 x 600 x 30-250mm
λD = 0.035 W/m·K
If you are working on a similar specification, speak to our team.
We can help you assess your project requirements and select the right product for your application.